jeffrey.bartlett@LIGO.ORG - posted 08:07, Wednesday 21 October 2015 (22716)
Ops Owl Shift Summary
Activity Log: All Times in UTC (PT)

07:00 (00:00) Take over from TJ
08:18 (01:18) Jenne & Nutsinee – Leaving the site
08:23 (01:23) Guardian error – Trying to select INIT. ISC_LOCK reload fixed problem.
08:30 (01:30) redoing initial alignment
12:51 (05:51) Finished initial alignment – Trying to relock
12:57 (05:57) Lockloss at LOCK_DRMI_1F
12:58 (05:58) Peter – Going into LVEA to take some photos
13:03 (06:03) Peter – Out of LVEA
13:10 (06:10) Continuing working on relocking
15:00 (08:00) Turn over to Travis

End of Shift Summary:

Title: 10/21/2015, Owl Shift 07:00 – 15:00 (00:00 – 08:00) All times in UTC (PT)

Support: Jenne, Nutsinee, Jeff K., Sheila, Kiwamu 

Incoming Operator: Travis

Shift Summary: 
    No progress in relocking. Redoing initial alignment
    No luck with INPUT_ALIGN. Power jumps to 1, then immediately breaks lock. Spoke with Sheila. No progress. Sheila coming to site.   
   Completed Initial Alignment and start relocking. Made it to LOCK_DRMI_1F before lockloss
   Making progress at relocking, but still having difficulties. Sheila and Kiwamu are working through the problems.