Reports until 08:07, Thursday 22 October 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:07, Thursday 22 October 2015 (22743)
Ops Owl Shift Summary
Activity Log: All Times in UTC (PT)

07:00 (00:00) Take over from TJ
07:15 (00:15) Marissa & Kiwamu – Leaving for the night
09:42 (02:42) ETM-Y saturation
09:51 (02:51) ETM-Y saturation
10:05 (03:05) ETM-Y saturation
10:14 (03:14) ETM-Y saturation
14:07 (07:07) Received GRB alert – Executed checklist procedures – Stand-down until 15:07
14:41 (07:41) Received GRB alert – Executed checklist procedures – stand-down until 08:41) 
15:00 (08:00) Turn over to Travis




End of Shift Summary:

Title: 10/21/2015, Owl Shift 07:00 – 15:00 (00:00 – 08:00) All times in UTC (PT)

Support:  

Incoming Operator: Travis

Shift Summary: 
   A few ETM-Y saturation during first half of the shift. Some of these saturations roughly coincided with a spike in the CS-Z microseism. There was a slight ring up of the 45MHz modulation at the same time.  
   CRB alert – Run through checklist - In stand-down until 15:07 (08:07)
   Second GRB alert – Execute checklist procedures