Displaying report 1-1 of 1.
Reports until 01:56, Friday 23 October 2015
H1 PSL
corey.gray@LIGO.ORG - posted 01:56, Friday 23 October 2015 (22767)
PSL Crystal Chiller Topped Off

Although it's technically Fri morning, I did check on the PSL chiller since its on the Thursday section of the Operator Check Sheet.  Tonight I topped it off with 100mL of water (it was last topped off yesterday with 150mL).

Displaying report 1-1 of 1.