TITLE: Oct 27 OWL Shift 7:00-15:00UTC (00:00-08:00 PDT), all times posted in UTC
STATE Of H1: Locking
OUTGOING OPERATOR: Patrick
QUICK SUMMARY: Jenne and Patrick discussing the state of affairs with Doug at Livingston. They’ve been down for 30+ hours and we’re currently having issues with ISS second loop not engaging. Kiwamu is on his way in. It looks as if my shift will get cut short when L1 goes into maintenance day (04:00PDT)