Displaying report 1-1 of 1.
Reports until 15:31, Friday 23 October 2015
H1 ISC
evan.hall@LIGO.ORG - posted 15:31, Friday 23 October 2015 - last comment - 11:12, Tuesday 27 October 2015(22781)
Tidal offloading performance over the past 45 days

Daniel, Sheila, Evan

Summary

Over the past 45 days, we had two instances where the common-mode length control on the end-station HEPIs hit the 250 µm software limiter. One of these events seems to have resulted in a lockloss.

Details

The attached trends show the ISC drives to the HEPIs, the IMC-F control signal, and the IMC-F offloading to the suspension UIMs over the past 45 days. One can see two saturation events: one on 25 September, and another on 11 October.

We survived the event on 11 October: the EY HEPI hit the rail, and counts began to accumulate on the EY UIM, but the control signal turned around and HEPI came away from the rail. On the 25th of September, both end-station HEPIs hit the rail, and after about 2 hours of counts accumulating on the UIMs, IMC-F ran away (second attachment). Note that both HEPI drives started at 0 µm at the beginning of the lock stretch.

Non-image files attached to this report
Comments related to this report
daniel.sigg@LIGO.ORG - 18:39, Friday 23 October 2015 (22788)

Both of these periods experienced large common drifts, when a pure tidal excitation would repeat after 24 hours. This may indicate a problem with the reference cavity temperature and PSL/LVEA temperature during these days.

hugh.radkins@LIGO.ORG - 11:12, Tuesday 27 October 2015 (22882)

Added PSL Temp Trends log in 22881.

Displaying report 1-1 of 1.