H1 BSC Temperature Sensors EX/EY
Temperature sensors for BSC9 and BSC10 were installed this morning. Sensors were installed on southeast corner of each chamber (next to SUS-R1 rack).

List of activities done at each end station:

EX
1. BNC cable from electronics room (PEM-C1) was pulled back from PEM area in VEA and routed to Southeast corner of BSC9. 
2. Power cable was pulled from SUS-R1 to BSC9.
3. Temperature sensor was installed by using a C-clamp to hold sensor securely next to chamber outer wall.

EY.
1. BNC cable was pulled from electonics room (PEM-C1) to southwest corner of BSC10. 
2. Power cable was pulled from SUS-R1 to BSC10.
3. Temperature sensor was placed in final location, but not secured by C-Clamp.