Temperature sensors for BSC9 and BSC10 were installed this morning. Sensors were installed on southeast corner of each chamber (next to SUS-R1 rack). List of activities done at each end station: EX 1. BNC cable from electronics room (PEM-C1) was pulled back from PEM area in VEA and routed to Southeast corner of BSC9. 2. Power cable was pulled from SUS-R1 to BSC9. 3. Temperature sensor was installed by using a C-clamp to hold sensor securely next to chamber outer wall. EY. 1. BNC cable was pulled from electonics room (PEM-C1) to southwest corner of BSC10. 2. Power cable was pulled from SUS-R1 to BSC10. 3. Temperature sensor was placed in final location, but not secured by C-Clamp.