H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 16:41, Tuesday 27 October 2015 - last comment - 16:53, Tuesday 27 October 2015(22897)
Ops Day Shift Summary

TITLE: "10/27 [DAY Shift]: 15:00-15:00UTC (8:00-16:00 PDT), all times posted in UTC"

STATE Of H1: Observing at 78 Mpc

SUPPORT: Control room folks

SHIFT SUMMARY: Maintenance period went well. There were couple of things that happened before I was informed and both had potentials of interfering with on-going tasks so please do not forget to come by or call the control room to check with operator on duty. We had a little trouble locking DRMI. After locking PRMI everything went smoothly. Jenne ran a2L script and and Evan was doing some measurement before we went to Observing. Then a GRB alert shortly after. The ifo is currently in Stand-down mode.

INCOMING OPERATOR: Patrick

ACTIVITY LOG:

15:08 Richard transitioning LVEA to LASER SAFE. Bubba begins grouting work. PSL is not down. IMC still locks.

15:21 Hugh to EY to check HPI fluid and secure light pipe between table and BSC

15:23 Jeff and TJ to pipe bridge between HAM4 and HAM5

            Ryan patching alog

15:25 Ken to the beamtube 250 meters from end X

           Jodi et al to mid X

15:35 Fil to both ends for temperature sensors installation

           Dale to LVEA taking pictures

15:40 Karen to LVEA and EY to cleam

           Jason to diode room to restart PSL WD

15:48 Hugh leaving EY, heading to EX. Jason out of diode room.

15:52 Christna to LVEA.

           Ryan done patching alog.

           Kiwamu leaves laser at high power for ISS measurement

16:00 Dale back

16:05 Mitchell taking Sprague to LVEA

         Jonathan installing EPICS IOC to monitor Beckhoff PLC

16:14 Jodi to LVEA checking on 3IFO stuff

16:19 Kyle to check on HAM3 ion pump

         Mitchell out

16:27 Hugh done

          Jodi out of LVEA

16:36 Karen out of EY

16:52 Maddie called to make sure it's okay to restart h(t) DMT. Things went well.

17:00 Christina opening the roll up door. Karen called saying she's at EX. Fill also there.

17:18 DMT0 - Ryan Fisher called to say he's restarting some process and shouldn't affect anything. Next time if people don't speak English-English I'm just gonna hand the phone over to Jeff Kissel.

17:26 Jeff done with charge measurement (started about an hour ago).

          Evan to LVEA installing cable at ISC rack (R1 to R4).

17:41 Fil done at EX. Heading to EY.

17:44 Jeff K. begins EX charge measurement.

17:48 HAM2 tripped. Jeff K. recovered everything. HAM2 ISI switched to low gain.

18:04 TJ and Jeff B. done

18:13 Kiwamu and Sudarshan to LVEA measuring ISS second loop TF.

18:17 Richard at EX pulling some cable.

18:18 Hugh to HAM1 to check on grouting.

18:22 Hugh out.

18:44 Jeff done with EX charge measurement.

18:46 Jodi back from the Mid.

          Kiwamu out

          Grouting done

18:48 DAQ restart (Jim B)

18:59 Kiwamu done with ISS for the day.

19:01 NDS not come back. DAQ restart again.

         Fil done at EY and done with all temperature sensors installation.

19:06 Richard leaving EX

19:50 Begins initial alignment. Cheryl and Jeff K to LVEA doing sweep.

19:52 Cheryl to Optics lab

20:07 Cheryl out

20:45 Kyle to anchor ion pump 275m from EY.

          Richard to HAM6 to put on safety sticker.

20:58 Richard done

21:52 Evan to unplug the cable.

21:56 Evan out.

21:59 Observing/Sciencing

22:40 GRB alert. Stand down.

 

Comments related to this report
john.zweizig@LIGO.ORG - 16:53, Tuesday 27 October 2015 (22902)CAL
I don't see this reported elsewhere in the log, but the DAQ restarts seem to have introduced a large (5 minute?) lag in the calibration pipeline. To fix this, Maddie restarted the pipeline at about 21:04 UTC (14:04 PDT). This resulted in a few (unlocked data) h(t) frames being lost, but the pipeline latency is reduced to ~11s.