Reports until 02:40, Friday 24 February 2012
LHO General
jonathan.berliner@LIGO.ORG - posted 02:40, Friday 24 February 2012 (2293)
Thursday Ops Log
- Stoneway visits for electrical work
- Apollo grouting input arm beam tubes
- TMS finishes rough alignment at EY
- Doug to teach Dan and Cheryl how to operate Total Station
- Leak-checking of vacuum feedthrus pending cabling work
- PSL: waiting for wind to die down before HVAC installation
- Apollo leak-check on crane