Reports until 17:38, Wednesday 28 October 2015
LHO General
patrick.thomas@LIGO.ORG - posted 17:38, Wednesday 28 October 2015 (22934)
Ops Eve Beginning Shift Summary
TITLE: 10/28 [EVE Shift]: 23:00-07:00 UTC (16:00-00:00 PDT), all times posted in UTC
STATE Of H1: Unlocked
OUTGOING OPERATOR: Nutsinee
QUICK SUMMARY:
Lights appear off in the LVEA, PSL enclosure, end X, end Y and mid X. I can not tell from the camera if they are off at mid Y.
Winds are less than 20 mph.
ISI blends are at 45 mHz.
Earthquake seismic band is between 0.01 and 0.1 um/s. Microseism is between 0.1 and 0.7 um/s.

Nutsinee was struggling with locking ALS when I came in. Kyle had been working on HAM3 and the mode cleaner was locked on an odd mode. Cheryl moved MC2 and I did an initial alignment. Now attempting to get to NLN.