Reports until 08:27, Friday 30 October 2015
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 08:27, Friday 30 October 2015 - last comment - 08:29, Friday 30 October 2015(22974)
Day Ops Transition

TITLE: "10/30 [DAY Shift]: 15:00-23:00UTC (08:00-16:00 PDT), all times posted in UTC"

STATE Of H1: Lock Acquisition

OUTGOING OPERATOR: TJ

QUICK SUMMARY: Wind ~30 mph. Switched to 90mHz blend. TJ reported he had trouble with DRMI when so he had to switched it back to 45 mHz. Just had a lockloss at DRMI so I'm gonna try switching the blend back to 45 before doing DRMI. Things don't look very hopeful.

Comments related to this report
nutsinee.kijbunchoo@LIGO.ORG - 08:29, Friday 30 October 2015 (22975)

Lockloss at FIND IR when trying to swtich blend mid way. Now I know it can't be done....