bubba.gateley@LIGO.ORG - posted 16:21, Friday 30 October 2015 (22986)
Beam Tube Enclosure Joint Repair on the X-Arm
This week we installed and caulked aluminum strips on a total of 120 meters of enclosure. We have completed the upper section on 840 meters of enclosure between Mid X and End X.