SEI: Hugh – Finished HAM1 data collection over the weekend CDS: Several staff out this week. Limited activities PSL: All OK – Nothing to report VAC: Kyle – Working at X28. Kyle – Expects failure of Annulus Ion pumps throughout the site, which will be replaced as they fail. FMC: Bubba – The repair work on the beam tube enclosure continues. Planned Tuesday Maintenance Work: Bubba – Grease supply fans at CS, Mids, and Ends (WP #5586) Bubba – Remove grout forms from HAM1 Hugh – Power cycle ITM-Y ISI coil driver (WP #5587) Jodi – Forklifting storage load from 1-Ton into Mid-X (WP #5589) Rick – Photograph ETM surface looking for contamination (WP #5585) Jason – Inspect, photograph, and document Bio switch states for all H1 OpLevs (WP #5588) Richard – Continue installing PEM temperature sensors Checking Beckhoff cabling Solar panel installation on X-Arm (maybe) Keita - Measure dark offset of ISS Second Loop Check whitening gain for Baffle Diode at CS, and Ends LN2 deliveries scheduled for Mid-X and Mid-Y