Reports until 10:36, Monday 02 November 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 10:36, Monday 02 November 2015 (23039)
08:30 Meeting Minutes & Tuesday Maintenance Schedule
SEI:
Hugh – Finished HAM1 data collection over the weekend

CDS:
Several staff out this week. Limited activities

PSL:
All OK – Nothing to report

VAC:
Kyle – Working at X28.
Kyle – Expects failure of Annulus Ion pumps throughout the site, which will be replaced as they fail.  

FMC:
Bubba – The repair work on the beam tube enclosure continues. 

Planned Tuesday Maintenance Work:
Bubba – Grease supply fans at CS, Mids, and Ends (WP #5586)
Bubba – Remove grout forms from HAM1 
Hugh – Power cycle ITM-Y ISI coil driver (WP #5587)
Jodi – Forklifting storage load from 1-Ton into Mid-X (WP #5589)
Rick – Photograph ETM surface looking for contamination (WP #5585)
Jason – Inspect, photograph, and document Bio switch states for all H1 OpLevs (WP #5588)
Richard – Continue installing PEM temperature sensors 
	         Checking Beckhoff cabling
	         Solar panel installation on X-Arm (maybe)
Keita - Measure dark offset of ISS Second Loop 
	    Check whitening gain for Baffle Diode at CS, and Ends

LN2 deliveries scheduled for Mid-X and Mid-Y