Reports until 16:07, Monday 02 November 2015
H1 OpsInfo
jeffrey.bartlett@LIGO.ORG - posted 16:07, Monday 02 November 2015 (23051)
Ops Day Shift Summary

 

Activity Log:All Times in UTC (PT)

 

16:00(08:00) - Take over from JIm

17:00 (09:00) Beam tube repair crew going to X-Arm 1/2 way between Mid and End stations

18:30 (10:30) Jodi, Christina, & Karen – Going to offsite warehouse

18:30 (10:30) Kyle – Going to X28 to recover equipment

19:08 (11:08) Kyle – Back from X28

20:30 (12:30) Jodi, Christina, & Karen – Back from the offsite warehouse

00:00 (16:00) Turn over to Cheryl

 

End of Shift Summary:

 

Title: 11/02/2015, DayShift 16:00 – 00:00(08:00 – 16:00) All times in UTC (PT)

Support:

Incoming Operator: Cheryl

Shift Summary:

 Good day shift. IFO has been locked in Observation mode, 22.3w, 74Mpc for the past 12.5 hours. Environmental conditions are good, with winds still a light breeze (4-7mph) or less, and microseism improving, (now between 0.4 & 0.3 um/s). The trend continues downward. There were 3 ETM-Y saturations during the shift.