Activity Log:All Times in UTC (PT)
16:00(08:00) - Take over from JIm
17:00 (09:00) Beam tube repair crew going to X-Arm 1/2 way between Mid and End stations
18:30 (10:30) Jodi, Christina, & Karen – Going to offsite warehouse
18:30 (10:30) Kyle – Going to X28 to recover equipment
19:08 (11:08) Kyle – Back from X28
20:30 (12:30) Jodi, Christina, & Karen – Back from the offsite warehouse
00:00 (16:00) Turn over to Cheryl
End of Shift Summary:
Title: 11/02/2015, DayShift 16:00 – 00:00(08:00 – 16:00) All times in UTC (PT)
Support:
Incoming Operator: Cheryl
Shift Summary:
Good day shift. IFO has been locked in Observation mode, 22.3w, 74Mpc for the past 12.5 hours. Environmental conditions are good, with winds still a light breeze (4-7mph) or less, and microseism improving, (now between 0.4 & 0.3 um/s). The trend continues downward. There were 3 ETM-Y saturations during the shift.