Reports until 16:00, Tuesday 03 November 2015
H1 OpsInfo
jeffrey.bartlett@LIGO.ORG - posted 16:00, Tuesday 03 November 2015 (23075)
Ops Day Shift Summary
Activity Log: All Times in UTC (PT)

15:51 (07:51) Norco - LN2 delivery to Mid-Y 
16:00 (08:00) Take over from Jim
16:00 (08:00) Bubba – Greasing fans in the LVEA
16:00 (08:00) Ken – Working on solar panel on X-Aem
16:00 (08:00) Joe – Removing grouting forms from HAM1
16:15 (08:15) Christina & Karen – Cleaning at End-Y
16:15 (08:15) Jodi & Mitchel – Going to Mid-X to unload 1-Ton
16:18 (08:18) Filiberto & Leslie – Working on Temp sensors at BSC1 & BSC3
16:24 (08:24) Richard – Going into LVEA to check Beckhoff cabling
16:30 (08:30) Bubba – Finished in the LVEA going to End-X then Mid-X to grease fans
16:46 (08:46) Richard – Out of LVEA – Going to End-Y 
16:50 (08:50) Restart GraceDB 
16:52 (08:52) Norco – LN2 delivery to Mid-X
17:00 (09:00) Christina & Karen – Finished at End-Y – Going to End-X
17:04 (09:04) Jason – Finished with OpLev survey in the LVEA – Going to End-X
17:06 (09:06) Kyle & Gerardo – Going to Mid-Y, Mid-X, and End-X moving vacuum equipment
17:09 (09:09) Nutsinee – Going into LVEA to work on CO2Y table
17:14 (09:14) Jodi & Mitchel – Done with stroage moves at Mid-X
17:15 (09:15) Richard – Back from End-Y
17:16 (09:16) Hugh & Richard - Going into CER to work on ITM-Y Coil Driver
17:20 (09:20) Bubba – Finished with fans on Y arm – Going to X-Arm
17:21 (09:21) Jason – Finished with survey at End-X – Going to End-Y 
17:22 (09:22) Keita – Going into LVEA to check transimpedance gain for ACB diode amps
17:45 (09:45) Restart GraceDB 
17:48 (09:48) Christina & Karen – Finished at End-X – Going to the LVEA
17:49 (09:49) Richard – Going into CER to test ITM-Y Coil Driver with Hugh
17:50 (09:50) Jason – Back from End-Y – Finished with OpLev survey
18:10 (10:10) US Linen on site
18:25 (10:25) Nutsinee – Out of LVEA – Going to End-Y to restart PCal camera controller
18:30 (10:30) Richard & Ken – Going to work on solar panel on Y-Arm
18:33 (10:33) Peter – Going into the LVEA
18:35 (10:35) Keita – Finished at CS – Going to End-X and then End-Y
18:40 (10:40) Peter – Out of the LVEA
18:45 (10:45) Hugh – Finished with Coil Driver work
18:45 (10:45) Hugh – Going to end stations to check HEPI fluid levels
19:05 (11:05) Nutsinee – Back from end stations
19:11 (11:11) KingSoft – Going to RO to check water system
19:14 (11:14) Richard & Ken – Going to solar panel on Y-Arm
19:16 (11:16) Hugh – Back from End Stations HEPI check – Checking the CS HEPIs
19:19 (11:19) Bubba – Finished greasing fans
19:20 (11:20) Nutsinee – Going back to End-Y to work on camera controller
19:22 (11:22) Keita – Finished at End-X – Going to End-Y
19:32 (11:32) Kyle & Gerardo – Finished 
19:35 (11:35) Filiberto & Leslie – Finished in LVEA
19:36 (11:36) Richard & Ken – Finished at Y-Arm – Going to X-Arm
19:45 (11:45) Nutsinee – Back from End-Y
19:55 (11:55) Ed & Jeff B – Sweep the LVEA
20:00 (12:00) Keita – Finished at End-Y – Turned off lights and WAP
20:02 (12:02) Jeff & Jason – Running charge measurements at End-Y and End-X
21:05 (13:05) Start relocking
22:16 (14:16) Kyle & Gerardo – Going to X28
23:42 (15:42) Keita & Kiwamu – Going into LVEA to check on ISS Second Loop
23:48 (15:48) Keita & Kiwamu - Out of the LVEA
00:00 (16:00) Turn over to Patrick
 

End of Shift Summary:

Title: 11/03/2015, Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT)

Support: Jeff K, Ed, Jenne

Incoming Operator: Patrick

Shift Summary: Completed maintenance and measurement tasks at ~13:00. Ran initial alignment. Working on relocking.