Displaying report 1-1 of 1.
Reports until 18:03, Friday 06 November 2015
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 18:03, Friday 06 November 2015 (23166)
Ops EVE Shift Transition

TITLE: "11/06 [EVE Shift]: 23:00-07:00UTC (16:00-00:00 PST), all times posted in UTC"

STATE Of H1: Observing at ~ 80Mpc

OUTGOING OPERATOR: Ed

QUICK SUMMARY: LLO was down for some commissioning. Robert took the opportunity to do some injection on HAM1. Wind ~5mph. EQ band seismic activity slowly increase and now cruising between e-2 and e-1 um/s. Microseism is crossing over the 50th percentile line. 