Reports until 00:10, Saturday 07 November 2015
H1 General
nutsinee.kijbunchoo@LIGO.ORG - posted 00:10, Saturday 07 November 2015 (23173)
Ops EVE Shift Summary

TITLE: "11/06 [EVE Shift]: 23:00-07:00UTC (16:00-00:00 PST), all times posted in UTC"

STATE Of H1 Lock Acquisition

SUPPORT

SHIFT SUMMARY: The ifo is down due to earthquake(s).

INCOMING OPERATOR: Patrick

ACTIVITY LOG:

00:38 LLO called saying they will be "sweeping" for another 10 minutes. Robert has already gone to make injection in LVEA. Both sites out of Observing.

00:48 LLO done

00:57 Robert done. Back to Observing.

07:28 Lockloss. See alog23172