Reports until 08:00, Saturday 07 November 2015
LHO General
patrick.thomas@LIGO.ORG - posted 08:00, Saturday 07 November 2015 (23186)
Ops Owl End Shift Summary
TITLE: 11/07 [OWL Shift]: 08:00-16:00 UTC (00:00-08:00 PDT), all times posted in UTC
STATE Of H1: Locked. Observing @ ~ 80 MPc.
SHIFT SUMMARY: Started with IFO unlocked and earthquake ringing down. Had to restart the ops workstation when the local hard drive went into read only mode. Had trouble locking IMC after seismic had subsided. Tried clearing a bunch of filter histories. Ended up having to move MC2 mostly in pitch. Did an initial alignment. Trouble locking on DRMI and lock losses in later stages prompted me to move ISI blends to 45mHz. Got to NLN after this. Tried locking on PRMI at one point without success.
INCOMING OPERATOR: Ed