H1 PEM
robert.schofield@LIGO.ORG - posted 18:33, Saturday 07 November 2015 (23198)
HVAC experiments

Our range was shown to be limited by the HVAC (Link). Since then Bubba and John have reduced air and water flow rates. Today I repeated the experiment to see how well we are doing. It looks like the HVAC is costing us about 3 Mpc now instead of about 5 before. I started some experiments to narrow down the dominant source but the microseism came up so high that I have stopped and will complete them later. Here are the ranges of time in which the HVAC was not in a steady state (the changes were made during science mode). 

Sitewide shutdown of turbines and chiller pumps.

Nov. 7 UTC

Turn off 19:15:00 19:23:34

Turn on 19:30:00  to 19:36:40

Turn off 19:45:00  to 19:48:40

Turn on 20:00:00 to 20:04:45

Turn off 20:15:00 to 20:18:40

Turn on 20:30:00  to 20:35:05

CS experiments

Nov. 8 UTC

SF 5 & 6 off 00:34:00 to 00:34:10 seis about normal, no change in range

SF 5 & 6 on 00:44:10 to 00:44:30

Turbines off but chiller pump on 1:10:00 to 1:10:10

All on 1:20:00 to 1:20:20

Chiller pump off 1:30:00 to 1:30:15

Chiller pump on 1:40:00 to 1:40:30