TITLE: 11/08 [OWL Shift]: 08:00-16:00 UTC (00:00-08:00 PDT), all times posted in UTC STATE Of H1: Aligning SHIFT SUMMARY: Lost lock after earthquakes. Tried initial alignment starting with IR. Lost lock at ENGAGE_ASC_PART_3. Trouble staying locked on ALS. Started initial alignment from beginning. Waiting for ALS to converge. Got timing error on h1iopacs0. Cleared with diagnostic reset. Earthquake band has come back down to between 0.01 and 0.1 um/s. Microseism is still very high between 0.3 and 1 um/s. Winds have subsided to below ~ 10 mph. INCOMING OPERATOR: Ed