Reports until 12:53, Monday 09 November 2015
H1 General
edmond.merilh@LIGO.ORG - posted 12:53, Monday 09 November 2015 (23249)
Mid-Shift Summary - DAY

MID-SHIFT SUMMARY: The ongoing struggle for 45MhzRFAM stability is the order of the day so far. We’ve been down from a strong Alaskan earthquake since early this morning. The mode cleaner was successfully relocked after a 2µ radian pitch adjustment was made to MC2. There were no ISI nor HEPI trips. I’m awaiting the “go-ahead” to start the re-locking process upon Keita’s approval.