Displaying report 1-1 of 1.
Reports until 23:56, Monday 09 November 2015
LHO VE
kyle.ryan@LIGO.ORG - posted 23:56, Monday 09 November 2015 (23264)
~2330 hrs. local -> Started diesel generator on tilt-trailer located along BT at port X2-8
Generator should run through the night and all day tomorrow (powering lights used as heat in preparation for closing 10" gate valve and subsequent install of BT ion pump tomorrow)
Displaying report 1-1 of 1.