-
TITLE: 11/10 DAY Shift: 16:00-00:00UTC (08:00-16:00 PDT), all times posted in UTC"
-
STATE Of H1: Unlocked
-
SUPPORT: Keita, Betsy, Cheryl, Patrick
-
SHIFT SUMMARY: Maintenance went well, and relocking seemed like it was going to go well, but after losing lock a few steps away from Nominal, I was having trouble keeping green locked. At first the ALSX would lock and seem to be stable, and then the power would dip periodically. The PLL was having issues staying locked, so I thought that this may have been the issue, but then it seemed to have fixed itself and locking wasn't any better.
-
I have gone through 2 Initial alignments, maximized the comm beatnote, zeroed the dark offsets, made sure everything seems to be as aligned as I can get it. Keita pointed out to me that the IMC VCO is railed positive and negative, but not sure why. We will keep working and investigating.
-
INCOMING OPERATOR: Jeff B
-
ACTIVITY LOG:
-
16:00 Christina, Karen - Open receiving bay roll up door
-
16:01 Bubba - Starting well pump
-
16:02 Joe - To LVEA to test eyewash stations and charge lifts
-
16:16 Jordan, Vinny - To EY to set up megnetometers'
-
16:16 Ryan - reboot alog
-
16:17 Jodi - To LVEA to check on 3IFO items
-
16:19 Gerardo - To H2 enclosure to get parts
-
16:23 Bubba - To LVEA on the snorkel lift to check crane shims
-
16:30 Fil, Peter - To LVEA for cable measurements
-
16:38 Jodi - out
-
16:40 Christina, Karen - Leaving EY to EX
-
16:41 Hugh - To Ends to check HEPI fluid levels
-
16:49 Betsy - Starting EX charge measurement
-
17:04 Jason - To PSL Diode Room to reset PSL WD
-
17:06 Norco - N2 delivery, two trucks
-
17:09 Robert - To LVEA to move a shaker
-
17:17 Jason - done
-
17:19 Jordan, Vinny - back
-
17:26 Fil, Peter - back from LVEA, heading down the Xarm to X2-8, then down the yarm
-
17:25 ISI ITMX ST1/2 WD trip
-
17:30 Water delivery
-
17:30 Hugh - back
-
17:35 Hugh, Mitchell - To LVEA to check HAM6 CPS fitting, and then rotating HAM2 STS-2 seismometer.
-
17:40 - Robert - out
-
17:46 US Linens Delivery
-
17:50 Robert, Jordan, Vinny - To EY for Mag. investigation
-
18:00 Jodi - To MX
-
18:05 Hugh, Mitchell back
-
18:18 Kingsoft water into gate for water sample
-
18:30 Christina, Karen - To LVEA
-
18:33 Bubba - Done in the LVEA, heading to EX to lay tape
-
18:34 Coca-Cola Delivery
-
18:42 Jodi - back
-
18:47 Fil, Peter - back
-
18:49 Joe - To LVEA
-
19:25 Christina, Karen - out
-
19:27 Bubba - back
-
19:34 Joe - out
-
19:34 TJ - To LVEA to start sweep
-
19:50 TJ - out
-
19:54 TJ - To LVEA to unplug snorkel lift
-
20:00 TJ - out
-
20:43 Gerardo, Kyle - back from X2-8
-
21:03 Lockloss @ DARM_WFS
-
21:33 Lockloss @ NOISE_TUNINGS
-
21:43 PRMI to DRMI transition failed
-
22:00 Gerardo, Kyle, Fil to X2-8
-
23:11 Fil back
-
23:26 Gerardo, Kyle back