Title: 11/11 Owl Shift 7:00-15:00 UTC (0:00-8:00 PST). All times in UTC.
State of H1: Lock acquisition
Shift Summary: Wind dropped like a rock at ~15:00 UTC. I began an initial alignment since it had been down for 4 hours and had been through a windstorm. Microseism is trending up but still at a manageable level.
Incoming operator: TJ
Activity log:
8:33 GRB alert, LLO was down
12:03 Adjusted X and Y arm ALS fiber polarization
15:42 Chris to X arm for beam tube sealing