Beginning swept-sine test for CAL-INJ while LLO is down.
Swept-sine for 500-2000Hz began at 18:55:45 UTC and finished. Lost lock at 19:23 UTC.
To do the swept sine from 500-2000Hz I used the template at: https://svn.ligo.caltech.edu/svn/aligocalibration/trunk/Runs/O1/H1/Measurements/INJ/template_cw_inj_sweptsine_500to2000_20151111.xml I've attached the coherence and TF from CAL-INJ_CW_EXC to CAL-DELTAL_EXTERNAL_DQ.