NOISY SEISMIC: This shift continues to have elevated wind (averaging about 25mph) and useism (Corner Station hovering at 1um/s). Attached are screen shots of the useism, and the wind for the last 24hrs. One can view the useism band here.
TCSX LASER BACK: Nutsinee brought the TCSX laser back & that will probably take something on the order of an hour(s) to heat up ITMx.
INITIAL ALIGNMENT NOT POSSIBLE YET: Also tried starting an initial alignment. I was able to get the arms to lock up (Y-arm looked good & X-arm needed some ETMx tweaking), but they only stay locked on the order of seconds and then get bumped around by the wind and drop. So this will make Initial Alignment tough: Still too noisy for the arms.
I have all BSC ISIs on 45mHz Blends.
We can still hear the building creaking & swaying in the wind. :-/