Before commissioning starts on ISI-BSC8 next week, the tests and control work realized so far are reported in:
- E1100845-v3: aLIGO BSC-ISI, LHO Unit #1: Phase II Testing Report (Integration)
- E1100294-v2: aLIGO BSC-ISI, LHO Unit #1: Phase I Testing Report (Assembly Validation)