Displaying report 1-1 of 1.
Reports until 19:07, Saturday 14 November 2015
H1 General
corey.gray@LIGO.ORG - posted 19:07, Saturday 14 November 2015 (23405)
H1 Alignment Update: PRM Aligned! :)

(Warner, Drigger, Gray)

Summary:  Beams were not aligned onto PDs for PRM, so we had to touch alignment of PRM, RM1, & RM2

After getting a hand-off from Jim, went through Initial Alignment, just so I could see what he saw.  I made notes as I went:

This is where I called in Jenne for a rescue.  

So from PRM Align, we looked through ASC land and found big inputs on the DC1 & DC2 PDs.  

Then took ISC ALIGN to DOWN, and then only to PRX_LOCKED.  

While here we ultimately moved some optics around to help us get better.  I watched the DC pds and Jenne did the same and also looked at some QPD sum values, while I tweaked on the PRM (mainly).  I also tweaked on the RM1 & RM2 mirrors a little to get the DC1/2 values down to decent values (from 0.9 down below 0.2).  Jenne could clearly see the beam off the QPDs and walked me into a decent spot & I tweaked mirrors to minimize inputs on the DC pds.

Once we liked what we had, Jenne engaged the PRC1 p/y loops by hand, and this improved all the signals we were looking at (note:  she turned OFF the intergrators first [FM2's]...once loops INPUTs were ON, she turned on FM2's again).  At this point everything looked good.  We then went to PRM_ALIGN (which didn't do much, since Jenne did it all by hand).  I then waited and OFFLOADED PRM Alignment.

I also went to DOWN and back to PRM ALIGN to repeat and everything looked good.  

Now continuing with Initial Alignment!

 

Displaying report 1-1 of 1.