TITLE: 11/17 [DAY Shift]: 15:00-23:00 UTC (08:00-16:00 PDT), all times posted in UTC STATE Of H1: Down SHIFT SUMMARY: Too windy to lock. Entire day devoted to maintenance. INCOMING OPERATOR: Ed (holding off on coming in upon instructions from Mike) ACTIVITY LOG: 15:00 Ken installing GPS clock in control room 15:07 Bubba and Peter K. to H2 PSL enclosure to check on makeup air fan 15:53 Jeff and Jodi to H2 PSL enclosure for OMC extraction 15:59 Jim B. restarting broadcaster daqd 16:03 Jim B. done restarting broadcaster daqd 16:16 Gerardo to LVEA to join Jeff and Jodi 16:16 Filiberto pulling cable from electronics room to H1 PSL racks over HAM1 and HAM2 for EOM monitoring chassis 16:21 Joe D. to check charge in scissor lift at end Y 16:23 Keita to H1 PSL enclosure to start installation of chassis. Karen going with him to clean. 16:34 Hugh to end stations to check HEPI fluid levels 16:34 Sudarshan to MSR to check PCAL camera 16:37 Jason to H1 PSL diode room to reset PSL watchdog 16:41 Jason done resetting PSL watchdog, going to end X and then end Y to zero optical levers 16:43 Vinnie and Borja to end Y for glitch hunting 16:52 Kyle going back and forth to X28 in preparation for baking ion pump 17:08 Bubba done checking H2 PSL enclosure makeup air fan 17:16 LN2 delivery through gate (two trucks) 17:20 Joe D. back from end Y 17:21 Ryan working on alog 17:24 Sand truck through gate 17:24 Travis at end Y restarting PCAL camera 17:28 Travis done 17:28 Rick and Evan to end stations to put tamper stickers on PCAL hardware 17:37 Hugh and Travis back 17:37 Jason done at end X, going to end Y 17:39 Filiberto done pulling cable in LVEA, going to end Y to pull fiber for vacuum gauge 17:40 LN2 truck through gate 17:42 Bubba and John to end Y to check for noise from trap primers 17:54 Karen and Christina done cleaning in the LVEA, going to end stations. Christina reports a problem with the card reader between the LVEA and high bay. 17:56 Ryan done working on alog 18:17 Jodi and Jeff done. OMC extracted and craned over beamtube. 18:23 Gerardo out of LVEA 18:14 Started trying to lock ALS. 18:31 Arms would not stay locked on green. Gave up and put guardian back to down state. 18:32 Bubba and John back from end Y. Bubba getting meter left in LVEA. 18:37 Jason done zeroing optical levers at end stations, going to zero optical levers in LVEA 18:37 Offloaded SR3 M2 per "SR3 Cage Servo warning: Align SR3 to offload M2 actuators" guardian notice. Jenne put instructions in the ops "Troubleshooting the IFO" wiki. 18:42 Karen and Christina done at end Y, heading to end X 18:47 Betsy to electronics room to take picture of wifi cable for wiki 18:48 Rick and Evan done putting tamper stickers on PCAL hardware 18:56 Betsy to turn on wifi in LVEA for Jason in LVEA 19:01 Keita done installing chassis, starting rephasing 19:04 US Linen delivery, LN2 truck leaving 19:08 Jeff B. working on dust monitor plugging near HAM4 and HAM5 19:13 Pressed 'DAQ Clear Accumulated CRC' on CDS overview 19:15 Joe D. to end Y to unplug battery charger 19:26 Travis to end X and end Y to install protection covers on PCAL hardware 19:31 Karen and Christina done cleaning, leaving end X 19:38 Restarted CDS and OPS overview on video2. Dave changed the OPS overview medm to increase the gracedb query failure notice timeout time. 19:47 Filiberto done pulling fiber for vacuum gauge at end Y, going to pull fiber for vacuum gauge at end X 19:49 Hugh to LVEA to inventory 3IFO equipment 19:50 Jeff B. done 19:56 Joe D. back 19:58 Jeff B. back to LVEA to make one connection on dust monitor plumbing 20:11 Keita done rephasing 20:11 Betsy starting charge measurements 20:15 Jason done 20:21 Hugh done 20:30 Madeline W. updating calibration filters (WP5605). Notified over teamspeak. 20:31 Travis back 20:33 Madeline W. done. "The DMT/GDS h(t) pipeline is restarted and running again at LHO" 20:55 Vinnie and Borja back 21:20 Charge measurements done 21:21 Filiberto back 21:31 Dave restarting DAQ 21:31 Keita and Kiwamu remeasuring phase 21:50 Kyle and Gerardo to X28 to drill anchor holes 22:23 Keita and Kiwamu done 22:36 Bubba to mid X to check water/fogging on surveillance camera lens 22:47 Keita to PSL enclosure to measure RF level 22:56 Vinnie and Borja back to end Y to recheck glitch hunting results 22:58 Beckhoff SDF crashed, Dave leaving off, EDCU is red 23:07 Bubba back from mid X 23:07 Kyle and Gerardo back 23:20 Keita done 00:11 Power glitch !!! 00:14 Vinnie and Borja back 00:18 Dave restarting h1lsc0