TITLE: Nov 18 DAY Shift 00:00-08:00UTC (04:00-00:00 PDT), all times posted in UTC
STATE Of H1: Locking
SUPPORT: Kiwamu
LOCK DURATION: ≈3.5 hours
INCOMING OPERATOR: Nutsinee
END-OF-SHIFT SUMMARY: Lots of little issues that are documented in my activity log. Nutsinee arrived right as the Oklahoma quake broke our lock
ACTIVITY LOG:
01:25 begin initial alignment after Kiwamu re-aligned beam pointing in IMs and MCs
03:13 Locking sequence gave me trouble for a while at DRMI after it locked and dropped. Reverted back to PRMI to tweak. Transistioned to DRMI locked almost immediatley. Stopped at ASC_PART3. made it to Bounce_Violin_Mode_Damping and then broke
03:39 Have had to tweak th COMM VCO due to poor X buildup in FIND_IR. Now haveing Cage Servo issues. Kiwamu is on it.
03:55 back to locking again…
04:23 Diag reset on H1IOPASC0 Timing Error
04:47 IFO locked at NLN/75Mpc. Kiwamu cleaning up SDF after his work.
05:04 Noticed that the Lock Timer wasn’t running so I started it. Not sure if it supposed to be from NLN or Intent bit. It’s ≈10 minutes behind the intent bit.
08:00 Down due to Earthquake. Handing of to Nustsinee.