Displaying report 1-1 of 1.
Reports until 08:20, Friday 20 November 2015
LHO General
patrick.thomas@LIGO.ORG - posted 08:20, Friday 20 November 2015 (23590)
Ops Day Beginning Shift Summary
TITLE: 11/20 [DAY Shift]: 16:00-00:00 UTC (08:00-16:00 PDT), all times posted in UTC
STATE Of H1: Observing @ ~ 80 MPc.
OUTGOING OPERATOR: Jeff B.
QUICK SUMMARY: From the cameras the lights are off in the LVEA, PSL enclosure, end X, end Y and mid X. I can not tell if they are off at mid Y.
0.03 - 0.1 Hz seismic band is between ~ 0.01 and 0.04 um/s. 0.1 - 0.3 Hz seismic band is between ~ 0.1 and 0.4 um/s.
Winds are between ~ 0 and 5 mph.
ITMX, ITMY and BS ISI blends are on 45mHz. EMTX X and ETMY Y ISI blends are on 45mHz. ETMX Y and ETMY X ISI blends are on Quite_90.
Displaying report 1-1 of 1.