Displaying report 1-1 of 1.
Reports until 16:43, Friday 20 November 2015
LHO General
patrick.thomas@LIGO.ORG - posted 16:43, Friday 20 November 2015 (23608)
Ops Day End Shift Summary
TITLE: 11/20 [DAY Shift]: 16:00-24:00 UTC (08:00-16:00 PDT), all times posted in UTC
STATE Of H1: Locked at NLN
SHIFT SUMMARY: Out of observing while Jeff B. went to end Y. Lost lock when Keita and Evan removed the RF AM monitor coupler from the EOM driver cable. Switched blends to Quite_90. Had to move TMS X and Y to optimize green. Had to move BS and PRM to lock on DRMI. Lost lock on SWITCH_TO_QPDS. Locked on NLN.
SUPPORT: Jenne, Evan, Keita, Jim W.
INCOMING OPERATOR: TJ
ACTIVITY LOG:

16:12 Jeff B. to end Y to take pictures in receiving area and hallway to VEA, out of observing
16:18 Chris and Joe to X arm beam tube enclosure
16:39 Jeff B. back, back to observing
17:24 Bubba reports that the landscapers are bailing tumble weeds around the highbay
17:32 Landscapers truck driving back toward kitchen
18:20 Gerardo to mid Y to pick up power supply and then to X28
18:23 Karen to mechanical building to get coffee cups
18:36 Fire department through gate, notified Richard
18:38 Kyle to X28
18:38 Fire department to mid X to check on RFAR
Fire department back (forgot to note time, before 19:39)
19:54 Joe back, Chris on his way back
20:12 Kyle and Gerardo back
21:32 Evan and Keita into the H1 PSL enclosure to remove the RF AM monitor coupler from the EOM driver cable, out of observing
21:33 Kyle and Gerardo back to X28
21:38 Joe and Chris back to X arm beam tube enclosure
22:12 Evan and Keita done

Put ISI blends on Quite_90
Had to move TMS X and TMS Y to increase green power in both arms even though WFS were engaged
Went to LOCK_PRMI and misaligned PRM. Aligned the BS on flashes.
Realigned PRMI and was able to lock PRMI. Moved mostly PRM to increase power buildup.
Requested DRMI_LOCKED. Transition from LOCK_PRMI to DRMI_LOCKED failed. Eventually DRMI locked.

23:13 Joe and Chris back
23:38 Kyle and Gerardo back
Displaying report 1-1 of 1.