Displaying report 1-1 of 1.
Reports until 00:10, Sunday 22 November 2015
LHO General
patrick.thomas@LIGO.ORG - posted 00:10, Sunday 22 November 2015 (23635)
Ops EVE End Shift Summary
TITLE: 11/21 [EVE Shift]: 00:00-08:00 UTC (16:00-00:00 PDT), all times posted in UTC
STATE Of H1: Observing @ ~ 77 MPc.
SHIFT SUMMARY: Had trouble relocking after the earthquake at the beginning of shift. Have remained at NLN since. Went out of observing while Chris ran his swept-sine measurement. Winds have remained low. Survived two short peaks to ~ .2 um/s in the earthquake band.
INCOMING OPERATOR: Jeff B.
Displaying report 1-1 of 1.