The BSC8 HEPI actuators were placed in run configuration with fluid flowing through them. Immediately after the fluid was valved to bypass the actuators at 4pm Monday 3/5/12 by turning the 4-way bypass valves into recirculation mode. The pressure in the line out to the chamber is set at 70psi.