Reports until 00:00, Monday 23 November 2015
LHO General
patrick.thomas@LIGO.ORG - posted 00:00, Monday 23 November 2015 (23651)
Ops EVE End Shift Summary
TITLE: 11/22 [EVE Shift]: 00:00-08:00 UTC (16:00-00:00 PDT), all times posted in UTC

STATE Of H1: Observing @ ~ 78 MPc.
SHIFT SUMMARY: Had some trouble relocking after the earthquake again. Three SUS ETMY saturation since. No evidence of RF45 noise. Seismic and winds unchanged.
INCOMING OPERATOR: Nutsinee
ACTIVITY LOG:

02:21 UTC Rick S. leaving site