Displaying report 1-1 of 1.
Reports until 11:22, Tuesday 24 November 2015
H1 PSL (DetChar, PSL)
jason.oberling@LIGO.ORG - posted 11:22, Tuesday 24 November 2015 (23702)
H1 PSL FSS Maintenance

J. Oberling, P. King, E. Merilh

Over the weekend the FSS RefCav TPD dropped from ~1.4V to ~1.0V, so we went in to realign it.  This was all done with the ISS off.  Results:

The alignment was recovered entirely with a pitch adjustment of the RefCav input periscope mirrors.  This completes LHO work permit #5622.

Displaying report 1-1 of 1.