Reports until 15:52, Thursday 26 November 2015
LHO General
patrick.thomas@LIGO.ORG - posted 15:52, Thursday 26 November 2015 (23746)
Ops DAY End Shift Summary
TITLE: 11/26 [DAY Shift]: 16:00-00:00 UTC (08:00-16:00 PDT), all times posted in UTC

STATE Of H1: Observing @ ~ 75 MPc.
SHIFT SUMMARY: Lost lock for unknown cause. Relocked fairly easily. Observing since. Bubba came in to increase the temperature at end Y. Winds have calmed back down to between ~ 0 and 5 mph. Earthquake band has dropped back down to between 0.01 and 0.03 um/s.
SUPPORT: Bubba
INCOMING OPERATOR: Jim W.