TITLE: 11/30 DAY Shift: 16:00-00:00UTC (08:00-16:00PDT), all times posted in UTC
STATE of H1: Locked at 72Mpc for 12+hrs
Incoming Operator: Travis
Support: None needed
Quick Summary: Very quiet shift with H1 hovering between 75-80Mpc. 0.03-0.01 seismic is noticeably trending down over the last 24hrs. useism is holding just under 0.5um/s (so we still have 45mHz Blends ON).
Shift Log:
-
ETMy Saturations: 16:43, 16:47
-
17:21-17:26 CER temperatures high and Richard is going to check. He will tread lightly & we will stay in Observring during his incursion.
-
17:26 Xarm Beamtube work (Joe & Chris)----> This work CANCELLED due to non-functioning man-lift & freezing conditions.
-
17:50-18:00 Addressing frozen chemical bunker door (bartlett)
-
18:46 Minivan at Receiving (Manny)
-
18:49 (also after lunch) Work in Optic Lab (Betsy)
-
Corner Station Air Handler is having another HIGH, MAJOR alarm
-
Checked Visitor list in Control Room to make sure it is current.
-
20:35 Monthly Alert System Test phone call received
-
21:11 High EY temperature alarm starts (Bubba & John were actively working on this & are the culprits!) :)
-
22:00 Can't restart Verbal Alarm; restarted around 23:53
-
22:44-22:53 Optics Lab visit (Joe D.)