This work was done on Tuesday Dec. 1 2015.
The following EPICS channels were created and added to the DAQ:
X2-8:
H1:VAC-EX_X6_PT527_PRESS_OVERRANGE
H1:VAC-EX_X6_PT527_PRESS_SENSOR
H1:VAC-EX_X6_PT527_PRESS_TORR
H1:VAC-EX_X6_PT527_PRESS_TRIP
H1:VAC-EX_X6_PT527_PRESS_UNDERRANGE
H1:VAC-EX_X6_PT527_PRESS_VALID
Y2-8:
H1:VAC-EY_Y6_PT427_PRESS_OVERRANGE
H1:VAC-EY_Y6_PT427_PRESS_SENSOR
H1:VAC-EY_Y6_PT427_PRESS_TORR
H1:VAC-EY_Y6_PT427_PRESS_TRIP
H1:VAC-EY_Y6_PT427_PRESS_UNDERRANGE
H1:VAC-EY_Y6_PT427_PRESS_VALID
h1ecaty1
ran svn update of C:/SlowControls (see h1ecaty1_update.png for updates (the updates not shown were TwinCAT3 related))
made changes to C:/SlowControls/TwinCAT/Source/Current/Interferometer/End/Plc1.pro to add variables for X2-8 and Y2-8 vacuum gauges and commited changes to svn (revision 2553)
ran svn update of C:/SlowControls
LIGO TwinCAT Target Configuration: H1ECATY1: SYS, PLC1, PLC2, PLC3: Update from source
C:/SlowControls/Target/H1ECATY1/H1ECATY1.tsm:
PLC - Configuration: PLC1: ReScan
Undisabled Vacuum Gauge NEG (BPG 402)
Saved
LIGO TwinCAT Target Configuration: H1ECATY1: SYS, PLC1, PLC2, PLC3: Compile
C:/SlowControls/Target/H1ECATY1/H1ECATY1.tsm:
PLC - Configuration: PLC1: ReScan
Saved
PLC - Configuration: PLC2: ReScan
PLC - Configuration: PLC3: ReScan
Saved
Put TwinCAT into configuration mode and scanned for devices
Found new vacuum gauge and 2 fiber converter boxes
Added the new vacuum gauge and fiber converter boxes to the configuration
Put into free run
Changed pressure readout for the new vacuum gauge to torr and saved to nonvolatile memory
Linked the variables for the new gauge
Changed the name of the new gauge and fiber converter boxes
Generate Mappings
Check Configuration
Activate Configuration
Put into run mode
Saved, copied to C:/SlowControls/Scripts/Configuration/H1ECATY1/SYS, commited to svn
Ran svn update on C:/SlowControls
(see h1ecaty1_config.png for picture of system manager configuration)
Stopped running EPICS IOC
LIGO TwinCAT Target Configuration: H1ECATY1: SYS, PLC1, PLC2, PLC3: Everything
PLC1 and PLC3 did not run, had to open by hand, login and run
burtrestored all PLCs to 6:10 AM (local time)
h1ecatx1
ran svn update of C:/SlowControls (see h1ecatx1_update_1.png, h1ecatx1_update_2.png, h1ecatx1_update_2.png for updates)
LIGO TwinCAT Target Configuration: H1ECATX1: SYS, PLC1, PLC2, PLC3: Update from source
C:/SlowControls/Target/H1ECATX1/H1ECATX1.tsm:
PLC - Configuration: PLC1: ReScan
PLC - Configuration: PLC2: ReScan
PLC - Configuration: PLC3: ReScan
Saved
LIGO TwinCAT Target Configuration: H1ECATX1: SYS, PLC1, PLC2, PLC3: Compile
C:/SlowControls/Target/H1ECATX1/H1ECATX1.tsm:
PLC - Configuration: PLC1: ReScan
PLC - Configuration: PLC2: ReScan
PLC - Configuration: PLC3: ReScan
Saved
Undisabled Vacuum Gauge NEG (BPG 402)
Saved
Put TwinCAT into configuration mode and scanned for devices
Found only fiber converter box
Tried a few more times, eventually found new vacuum gauge and 2 fiber converter boxes
Added the new vacuum gauge and fiber converter boxes to the configuration
Changed the name of the new gauge and fiber converter boxes
Put into free run
Changed pressure readout for gauge to torr and saved to nonvolatile memory
Linked the variables for the new gauge
Generate Mappings
Check Configuration
Activate Configuration
Put into run mode
Saved, copied to C:/SlowControls/Scripts/Configuration/H1ECATX1/SYS, commited to svn
Ran svn update on C:/SlowControls
(see h1ecatx1_config.png for picture of system manager configuration)
Stopped running EPICS IOC
LIGO TwinCAT Target Configuration: H1ECATX1: SYS, PLC1, PLC2, PLC3: Everything
PLC2 and PLC3 did not run, had to open by hand, login and run
burtrestored all PLCs to 6:10 AM (local time)