Reports until 15:45, Tuesday 01 December 2015
H1 TCS
nutsinee.kijbunchoo@LIGO.ORG - posted 15:45, Tuesday 01 December 2015 (23872)
HWSX alignment work

I got the green beam through both irises and fairly centered on every optic in the path. Any other beam that follows the green should travel parallel to the surface of the table. This alignment was done to get ready for the PBS installation next week. I didn't bother to look for the return sled beam.

Images attached to this report