Reports until 16:09, Tuesday 01 December 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:09, Tuesday 01 December 2015 - last comment - 09:26, Wednesday 02 December 2015(23877)
Ops Day Shift Summary
Activity Log: All Times in UTC (PT)

15:55 (07:55) Jeff B. – In the LVEA to take 3IFO storage temp/humidity data
16:00 (08:00) Peter – Into the PSL for alignment work (WP #5626)
16:08 (08:08) Take over from TJ
16:15 (08:15) Gerardo – Going to End-Y to pull high voltage cable for Ion pump at Y2-8
16:20 (08:20) Lockloss – Jeff K. running charge measurements at End-X
16:21 (08:21) Jeff K – Charge measurements on ETM-X
16:24 (08:24) Filiberto – Going to End-Y for cabling work (WP #5630)
16:26 (08:26) Bubba – Going down Y-Arm to survey for rock delivery
16:50 (08:50) John & Nutsinee – Going to TCS-X table to check view ports
16:50 (08:50) American Rock – Rock delivery along Y-Arm
16:55 (08:55) Joe – Going into the LVEA 
16:58 (08:58) Patrick – Starting on software side of WP #5630
17:00 (09:00) Jodi & Mitch – Going to End-Y to start garb room change (WP #5628)
17:08 (09:08) Bubba & Betsy – Going into LVEA to move Quad boxes – Using crane
17:18 (09:18) N2 delivery to End-X
18:35 (10:35) Filiberto – Finished at End-Y – Going to End-X (WP #5630)
18:41 (10:41) Joe – Going into LVEA to unplug battery chargers
18:42 (10:42) John & Nutsinee – Out of the LVEA
18:45 (10:45) Jeff K. – Going to End-Y to reset railed ESD
18:50 (10:50) Joe – Going to End-Y to check batteries
19:10 (11:10) Nutsinee – Going into the LVEA to work on HWS alignment
19:12 (11:12) Gerardo & Kyle – Back from X-Arm
19:15 (11:15) Contractor on site to meet with Bubba
19:24 (11:24) Richard and Ken out to End-X to check on some ION pump controls 
19:28 (11:28) Joe is back from End-Y
19:43 (11:43) Dave & Patrick – adding FMCS temperature channels (WP 35631)
20:05 (12:05) Locked IMC at the request and approval of Kissel and Landry.
20:07 (12:07) Kyle and Gerardo back from End-X. He says Filiberto is still there, though.
20:28 (12:28) Tried relocking – Found initial alignment off
20:40 (12:40) Redo initial alignment
21:34 (13:34) FD on site
21:53 (13:53) Kyle & Gerardo – Going to X2-8
22:27 (14:27) John & Bubba – Going to Mid-X 
22:37 (14:37) Kyle & Gerardo – Back from X-Arm
22:50 (14:50) Start relocking
23:49 (15:49) Locked at NOMINAL_LOW_NOISE
23:50 (15:50) In commissioning mode so Kissel can run measurements
00:07 (16:07) Turn over to Travis	



End of Shift Summary:

Title: 12/01/2015, Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT)

Support: Kiwamu
 
Incoming Operator: Travis

Shift Detail Summary: 16:00 (08:00) Start Tuesday maintenance window.
After maintenance window tried to relock. Green alignment bad. Realigned green and tried relocking. Found BS alignment was off. Did full initial alignment and tried to relock. Had a problem with OMC not finding carrier. Kiwamu found lower limit of carrier detection was too tight. He changed it in Guardian from 10% to 25% (which matches the upper limit). Continued with relocking and reached NOMINAL_LOW_NOISE. IFO is in observing mode while Kissel runs measurements. 	   
Comments related to this report
jeffrey.bartlett@LIGO.ORG - 09:26, Wednesday 02 December 2015 (23897)
These activities were recorded by Corey. He was backing me up while the I reconfigured the End-Y garbing room. 

17:00  Nutsinee & John went out to LVEA (did not notify control room, doing TCS Work?)
17:14  Saw rock truck exiting gate
17:48  Hugh going to EX/EY to check HEPI fluid levels (~30min)
17:49  Ken going to EY to investigate noisy emergency light
18:00  Ion Pump high power cable (Gerardo & kyle)
18:04  Jodi & Mitch returning from EY
18:06  Joe out from LVEA (charging batteries and checking eye wash stations)....will go back out to unplug chargers later
18:07  Beckhoff work (Patrick)
18:13  Data from dessicant cabinets (Bartlett)
18:16  forklifting SUS boxes from lvea to staging (Bubba, Betsy)  30min