Displaying report 1-1 of 1.
Reports until 17:26, Tuesday 01 December 2015
H1 CAL
jeffrey.kissel@LIGO.ORG - posted 17:26, Tuesday 01 December 2015 - last comment - 11:33, Wednesday 02 December 2015(23883)
New DARMOLGTF and PCALY to DARM Sweeps
J. Kissel

I've taken new DARM Open Loop Gain and PCAL2DARM transfer functions for the bi-weekly(-ish) full-frequency-span confirmation of the time variation in calibration / IFO parameters. As a by-product of these two transfer functions, we're able to confirm that the front-end, CAL-CS, DELTAL_EXTERNAL calibration (and therefore the low-latency GDS pipeline output) is still within the desired precision. I attach screenshots of the measurements. They will be processed in greater detail tomorrow, once we have the evening's kappa values (i.e. what the calibration lines are telling us the systemaic errors are in the model parameters). Stay tuned, but things continue to look exquisite. Great job CAL team!

DARM OLGTF Template:
/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O1/H1/Measurements/DARMOLGTFs/2015-12-01_H1_DARM_OLGTF_7to1200Hz.xml

Corresponding Exports:
/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O1/H1/Measurements/DARMOLGTFs/
2015-12-01_H1_DARM_OLGTF_7to1200Hz_A_ETMYL3LOCKIN2_B_ETMYL3LOCKEXC_coh.txt
2015-12-01_H1_DARM_OLGTF_7to1200Hz_A_ETMYL3LOCKIN2_B_ETMYL3LOCKEXC_tf.txt
2015-12-01_H1_DARM_OLGTF_7to1200Hz_A_ETMYL3LOCKIN2_B_ETMYL3LOCKIN1_coh.txt
2015-12-01_H1_DARM_OLGTF_7to1200Hz_A_ETMYL3LOCKIN2_B_ETMYL3LOCKIN1_tf.txt

PCAL2DARM TF Template:
/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O1/H1/Measurements/PCAL/2015-12-01_PCALY2DARMTF_7to1200Hz.xml

Corresponding Exports:
2015-12-01_PCALY2DARMTF_7to1200Hz_A_PCALRX_B_DARMIN1_coh.txt
2015-12-01_PCALY2DARMTF_7to1200Hz_A_PCALRX_B_DARMIN1_tf.txt
Images attached to this report
Comments related to this report
sudarshan.karki@LIGO.ORG - 11:33, Wednesday 02 December 2015 (23903)

The relevant kappas for this measuremnt are loctaed here:

/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/O1/H1/Results/CAL_PARAM/2015-12-02_LHOalog_23883_Kappas.mat
Displaying report 1-1 of 1.