Title: 12/3 Eve Shift 0:00-8:00 UTC (16:00-24:00 PST). All times in UTC.
State of H1: Lock acquisition
Shift Summary: Conditions for relocking aren't improving much. Microseism is still high at 0.6 um/s and the wind is picking up at ~30 mph.
Incoming operator: Jim
Activity log:
After the initial lockloss of my shift, and one short 20 min. lock stretch, I have been struggling to get very far (can't get PRMI to lock now). I have done initial alignment twice for lack of other things to try (AS camera has looked poor after both alignments).
3:10 reset TIM errors for H1SUSETMY and H1IOPASC0