Reports until 00:00, Friday 04 December 2015
H1 General
travis.sadecki@LIGO.ORG - posted 00:00, Friday 04 December 2015 (23948)
OPS Eve shift summary

Title: 12/3 Eve Shift 0:00-8:00 UTC (16:00-24:00 PST).  All times in UTC.

State of H1: Lock acquisition

Shift Summary: Conditions for relocking aren't improving much.  Microseism is still high at 0.6 um/s and the wind is picking up at ~30 mph. 

Incoming operator: Jim

Activity log:

After the initial lockloss of my shift, and one short 20 min. lock stretch, I have been struggling to get very far (can't get PRMI to lock now).  I have done initial alignment twice for lack of other things to try (AS camera has looked poor after both alignments). 

3:10 reset TIM errors for H1SUSETMY and H1IOPASC0