Reports until 16:05, Friday 04 December 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:05, Friday 04 December 2015 (23964)
Ops Day Shift Summary
Activity Log: All Times in UTC (PT)

16:00 (08:00) Take over from Jim
17:53 (09:53) Locksmith on site – Bubba will escort
18:26 (10:26) Betsy – Working in the optics lab
19:55 (11:55) Betsy – Out of Optics lab
22:45 (14:45) Lockloss – 7.1mag EQ in the south Indian Ocean
22:50 (14:50) Reset Timing error on H1SUSETMY
23:13 (15:13) Bubba – Going to End-Y to move garb room curtains away from temperature sensor 
23:49 (15:49) Bubba – Back from End-Y
23:58 (15:58) Hugh - Running TFs on End-X ISI
00:00 (16:00) Turn over the Cheryl



End of Shift Summary:

Title: 12/04/2015, Day Shift 16:00 – 00:00 (08:00 – 16:00) All times in UTC (PT)

Support: None
 
Incoming Operator: Cheryl

Shift Detail Summary: Overall a good observing shift until 7.1 magnitude EQ in the Southern Indian Ocean. Have the IFO in DOWN until the seismic conditions settle down. Took the opportunity of being down to reset the timing error on H1SUSETMY.