LHO General
corey.gray@LIGO.ORG - posted 08:28, Monday 07 December 2015 (24023)
Transition to DAY Shift Update

TITLE:  12/7 DAY Shift:  16:00-00:00UTC (08:00-16:00PDT), all times posted in UTC     

STATE of H1:  DOWN & HAM2/3 ISIs with Guardian issues being looked at.

Outgoing Operator:  Patrick

Quick Summary:  useism still elevated (LVEA at 1um/s, but might be trending down slightly if you squint at it).  The earthquake band (0.03-0.1Hz  band looks like it's finally returned to normal levels at about 14:00utc (6amPST).  Hugh is working on HAM2/3 ISI recovery.  

IFO has been down for 20+hrs.