Displaying report 1-1 of 1.
Reports until 00:07, Tuesday 08 December 2015
LHO General
patrick.thomas@LIGO.ORG - posted 00:07, Tuesday 08 December 2015 (24037)
Ops Owl Beginning Shift Summary
TITLE: 12/08 [OWL Shift]: 08:00-16:00 UTC (00:00-08:00 PDT), all times posted in UTC

STATE Of H1: Observing @ ~ 78 MPc.
OUTGOING OPERATOR: Nutsinee
QUICK SUMMARY: 
From the cameras:
The lights are off in the LVEA.
The lights are off in the PSL enclosure.
I can not tell if the lights are on or off at mid X and mid Y.
The lights are off at end X.
The lights are off at end Y.

The 0.03 - 0.1 Hz (earthquake) seismic band is between ~ 0.01 and 0.1 um/s.
The 0.1 - 0.3 Hz (microseism) seismic band is trending down and is currently between ~ 0.2 and 1 um/s.

The winds are between ~ 0 and 10 mph.

The ISI blends are on 45 mHz at ITMY, ITMX and BS. They are on Quite_90 at ETMX. They are on Quite_90 at ETMY X DOF and 45mHz at ETMY Y DOF. (see attached screenshot)

From pinging:
CDS WAP is off at the LVEA.
CDS WAP is on at mid X.
CDS WAP is on at mid Y.
CDS WAP is off at end X.
CDS WAP is off at end Y.
Images attached to this report
Displaying report 1-1 of 1.