Reports until 12:32, Tuesday 08 December 2015
H1 CDS (DAQ)
david.barker@LIGO.ORG - posted 12:32, Tuesday 08 December 2015 (24049)
CDS maintenance summary

analog video server restarted

Richard, Jim, Dave:

the h0video IOC was restarted on h0epics2 to re-establish connection to the Knox video matrix switch.

Added channel to DAQ broadcaster [WP5642]

Ryan F, Dave:

the hardware injection ODC channel for EX was added to the DMT broadcaster machine. Only h1broadcast0 was restarted, not the full DAQ.

DMT QFS server connection to QLogic switches [WP5643]

Dan, Carlos:

h1dmtfs0 was disconnected from its SATABOY and routed instead to the two DAQ QLogic switches in the MSR. This required running two longer multimode fiber optics cables from the X2200 to the switches. This is a temporary configuration to allow Dan to perform tests on the SATABOY which is showing errors.

Power cdsfs0 down to add hard drives [WP5637]

Jim, Carlos:

cdsfs0 (NFS server or /ligo) was powered down to install two 2TB HDD into spare SATA slots. Total downtime was < 5mins and all NFS clients reconnected.

CW hardware injection stopped and started

TJ, Dave:

The psinject process on h1hwinj1 was killed. This tested that monit correctly restarted the process (pass) and that the operator station's verbal alarm could be acknowledged to stop it announcing (failed). We may test this again later when TJ has new code.

h1pemmx trivial filter change to test daqsvn updates

Dave:

I made a trivial change to H1PEMMX.txt (added comment line at end) and loaded this into h1pemmx. This will test the periodic commit of these changes to DAQSVN. Change was made at 11:51:23 PST