TITLE: 12/10 EVE Shift 00:00-08:00UTC (16:00-00:00 PST), all times posted in UTC
STATE Of H1: Lock Acquisition/Environment
SUPPORT: Sheila, Jenne
Incoming Ops: Travis (failed to reach him so he's already on site)
END-OF-SHIFT SUMMARY: I've been trying to lock most of the evening. The shift started off with high wind (20-40 mph) then died down towards the end of shift (now ~10mph and below). Useism has been increasing (now at ~1.5 um/s). Locking was unsuccessful even with wind below 10mph.
Activity:
00:19 Kyle driving back from Y28