Reports until 05:35, Friday 11 December 2015
H1 General
travis.sadecki@LIGO.ORG - posted 05:35, Friday 11 December 2015 (24125)
OPS Owl shift summary

Title: 12/11 Owl Shift 8:00-16:00 UTC (0:00-8:00 PST).  All times in UTC.

State of H1: Unlocked due to microseism

Shift Summary: After Nutsinee's frustrating shift, I have had similar luck.  I made it as far as ENGAGE_ASC_PART3 twice, but while waiting there for the ASC loops to do their deeds, we lost lock.  Talked to Mike and he gave the OK to throw in the towel for the night.  Microseism is still above 1 um/s and winds are still 5-10 mph. 

Incoming operator: Ed

Activity log:  Attempting to lock all night.