Reports until 08:01, Sunday 13 December 2015
H1 General
travis.sadecki@LIGO.ORG - posted 08:01, Sunday 13 December 2015 (24169)
OPS Owl shift summary

Title: 12/13 Owl Shift 8:00-16:00 UTC (0:00-8:00 PST).  All times in UTC.

State of H1: Unlocked

Shift Summary:  Unlocked for a variety of issues for the entire shift.  Wind still 30 mph with 40 mph gusts.  Microseism still 0.9 um/s.  Peter K. is here looking at ISS issues that started at the end of Jeff's shift.

Incoming operator: TJ

Activity log: Peter is onsite looking at ISS issues in preparation for locking during better (?) conditions.